US$ 195.00
Pay in 4 interest-free payments of $6.12 Learn more
Coupler cut levers
HEIGHT 59mm
two underbody arrangements
KATO TRACK CODE S227
R40165 GNER Mk4 Open First Coach M 11417 option-set-106 Coupler cut leversBuilt at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push button operated plug type doors, fully sealed gangways and
US$ 195.00
US$ 140.00
US$ 735.00
US$ 16450.00